Bellingham Marine Bellingham Marine
  • Home
  • Products
    • Floating Docks
      • Concrete
        • Unifloat
        • Unibolt
      • Wood Docks
        • Unideck Timber
        • Portable Wood
      • Aluminum
    • Wave Attenuators
    • Floating Platforms
      • Landing Platforms
      • Portable Platforms
      • Floating Structures
    • Drystack
    • Shoreline Protection
      • Dolosse
    • Precast Products
  • Services
    • Residential
    • Design/Build
    • Pre-Construction
    • General Contracting
    • After-Market Care
    • Product Supply
  • About
    • Overview
    • History
    • Our Clients
  • Projects
  • Press
    • Press Releases
    • Articles
  • Blog
  • Careers
    • Life at Bellingham Marine
    • Apply for a Job
  • Contact
  • Log In
  • Employee Benefits
Close
  • Home
  • Products
    • Floating Docks
      • Concrete
        • Unifloat
        • Unibolt
      • Wood Docks
        • Unideck Timber
        • Portable Wood
      • Aluminum
    • Wave Attenuators
    • Floating Platforms
      • Landing Platforms
      • Portable Platforms
      • Floating Structures
    • Drystack
    • Shoreline Protection
      • Dolosse
    • Precast Products
  • Services
    • Residential
    • Design/Build
    • Pre-Construction
    • General Contracting
    • After-Market Care
    • Product Supply
  • About
    • Overview
    • History
    • Our Clients
  • Projects
  • Press
    • Press Releases
    • Articles
  • Blog
  • Careers
    • Life at Bellingham Marine
    • Apply for a Job
  • Contact
  • Log In
  • Employee Benefits

Bellingham Marine Announces Brian Bateman’s Retirement

January 25, 2022

Following over 14 years of dedicated service to its Southwest Division, Bellingham Marine announces the retirement of Brian Bateman.

Brian started as a subcontractor for Bellingham Marine, and later was officially hired on as a full-time electrical project manager for the Southwest Division. He was instrumental in developing the electrical division on the West Coast, creating a turnkey service for electrical installation and repair.

Over the years, Brian lent his electrical expertise to a plethora of projects from Balboa Bay Club in Newport Beach, Alamitos Bay Marina in Long Beach, multiple marinas in Marina del Rey, Westpoint Harbor in Redwood City, and countless other marinas.

As Brian moves into retirement, Bellingham Marine’s 10-year veteran David Day is taking over as the head electrical project manager and will keep the seasoned electrical crew moving forward. Brian has been a key to the Southwest Division’s success, and we wish him all the best in his retirement!

Posted in: Blog, Construction, Uncategorized Author: NICOLE CAPLAN

Share

FacebookTwitterGoogle +Pinterest

Leave a Reply / Cancel Reply

Explore Blog

Subscribe to our Mailing List

  • This field is for validation purposes and should be left unchanged.

Recent Posts

  • Superyachts Welcome at Palm Beach Marina
  • Construction Commences at The Marina at Dana Point
  • Port of LA Wilmington Waterfront Promenade
  • Newport Marina
  • Lake Berryessa Markley Cove B Dock Replacement
  • Back to Blog
  • Prev
  • Next

© 2018 - 2022. Bellingham Marine Industries. All Rights Reserved. Privacy Policy. XML Sitemap.