Bellingham Marine Bellingham Marine
  • Home
  • Products
    • Floating Docks
      • Concrete
        • Unifloat
        • Unibolt
      • Wood Docks
        • Unideck Timber
        • Portable Wood
      • Aluminum
    • Wave Attenuators
    • Floating Platforms
      • Landing Platforms
      • Portable Platforms
      • Floating Structures
    • Drystack
    • Shoreline Protection
      • Dolosse
    • Precast Products
  • Services
    • Residential
    • Design/Build
    • Pre-Construction
    • General Contracting
    • After-Market Care
    • Product Supply
  • About
    • Overview
    • History
    • Our Clients
  • Projects
  • Press
    • Press Releases
    • Articles
  • Blog
  • Careers
    • Life at Bellingham Marine
    • Apply for a Job
  • Contact
  • Log In
  • Employee Benefits
Close
  • Home
  • Products
    • Floating Docks
      • Concrete
        • Unifloat
        • Unibolt
      • Wood Docks
        • Unideck Timber
        • Portable Wood
      • Aluminum
    • Wave Attenuators
    • Floating Platforms
      • Landing Platforms
      • Portable Platforms
      • Floating Structures
    • Drystack
    • Shoreline Protection
      • Dolosse
    • Precast Products
  • Services
    • Residential
    • Design/Build
    • Pre-Construction
    • General Contracting
    • After-Market Care
    • Product Supply
  • About
    • Overview
    • History
    • Our Clients
  • Projects
  • Press
    • Press Releases
    • Articles
  • Blog
  • Careers
    • Life at Bellingham Marine
    • Apply for a Job
  • Contact
  • Log In
  • Employee Benefits

Press Releases

BELLINGHAM MARINE COMPLETES CONSTRUCTION OF HARBOR AT MARINA BAY

July 30, 2013

New concrete docks at Harbor at Marina Bay

The prestigious Harbor at Marina Bay, previously known as Bay Club Marina, located at 14015 Tahiti Way in Marina del Rey, California, reopened its marina in May 2013 after an extensive renovation. The entire existing marina was removed and replaced with a modern, low-maintenance concrete dock system with upgraded utilities and the latest in dockside amenities.

Owned and operated by AvalonBay, the new marina includes a total of 207 single berth slips and 11 end ties for boats from 22’ to 90’ on the end ties.

Bellingham Marine provided a complete turn-key package for this project including removal of the existing 30 year old dock system and construction of a new marina. Bellingham also provided permitting support and performed the design and manufacture of the dock system.

Marina Bay’s new floating docks feature a colored concrete finish with an ashlar’s stamped pattern. Other upgrades include contemporary designed gangways with accent lighting, in-slip sewer pump outs and rounded finger corners. The Harbor at Marina Bay also offers a newly installed paver promenade, boater restrooms with showers, very convenient boater parking and wireless internet.

“When the owners of Marina Bay approached us about this project, they were looking for the latest in floating dock technology; they wanted a dock system that was low-maintenance and a marina that was set apart from others in the Harbor in style and function,” said Eric Noegel, Manager of Project Development for Bellingham Marine’s SW division.

The new Harbor at Marina Bay serves as the focal point of the property’s high-end upland apartments. Boat slips were offered first to residents, and are now opened to the public for leasing. For information regarding slip availability, contact the Marina Manager at (310) 821-2542, mark-omel@avalonbay.com or visit the website at www.theharbor@marinabay.com

As the world’s leading marina design-build construction company, Bellingham Marine produces Unifloat® concrete floating dock systems as well as timber and metal frame systems. The company also produces Unistack® dry stack systems for marinas worldwide.

Contact: Bellingham Marine, P.O. Box 8, Bellingham, WA 98227; www.bellingham-marine.com.

Unifloat, Unideck and Unistack are registered trademarks of Bellingham Marine.

Posted in: Press Releases Author: leilanifera
Download Word Doc Download PDF

Share

FacebookTwitterGoogle +Pinterest

Leave a Reply / Cancel Reply

Explore Blog

Subscribe to our Mailing List

  • This field is for validation purposes and should be left unchanged.

Recent Posts

  • Construction Complete at Orange Beach Marina
  • Cosmetic Upgrade to Coasterra’s Event Float
  • Upgrades at Katherine Landing
  • Renovations Underway at San Francisco Bay Marina
  • Lake Mohave Marina Renovation Completed
  • Back to Blog
  • Prev
  • Next

© 2018 - 2022. Bellingham Marine Industries. All Rights Reserved. Privacy Policy. XML Sitemap.