Bellingham Marine Bellingham Marine
  • Home
  • Products
    • Floating Docks
      • Concrete
        • Unifloat
        • Unibolt
      • Wood Docks
        • Unideck Timber
        • Portable Wood
      • Aluminum
    • Wave Attenuators
    • Floating Platforms
      • Landing Platforms
      • Portable Platforms
      • Floating Structures
    • Drystack
    • Shoreline Protection
      • Dolosse
    • Precast Products
  • Services
    • Residential
    • Design/Build
    • Pre-Construction
    • General Contracting
    • After-Market Care
    • Product Supply
  • About
    • Overview
    • History
    • Our Clients
  • Projects
  • Press
    • Press Releases
    • Articles
  • Blog
  • Careers
    • Life at Bellingham Marine
    • Apply for a Job
  • Contact
  • Log In
  • Employee Benefits
Close
  • Home
  • Products
    • Floating Docks
      • Concrete
        • Unifloat
        • Unibolt
      • Wood Docks
        • Unideck Timber
        • Portable Wood
      • Aluminum
    • Wave Attenuators
    • Floating Platforms
      • Landing Platforms
      • Portable Platforms
      • Floating Structures
    • Drystack
    • Shoreline Protection
      • Dolosse
    • Precast Products
  • Services
    • Residential
    • Design/Build
    • Pre-Construction
    • General Contracting
    • After-Market Care
    • Product Supply
  • About
    • Overview
    • History
    • Our Clients
  • Projects
  • Press
    • Press Releases
    • Articles
  • Blog
  • Careers
    • Life at Bellingham Marine
    • Apply for a Job
  • Contact
  • Log In
  • Employee Benefits

Press Releases

MARINA BUILDER COMMISSIONS STUDY OF ECOSYSTEM

March 2, 2003

As part of an ambitious attempt to restore life to a virtually “dead” body of water, Vanderbilt Partners Ltd. recently contracted Bellingham Marine Industries to install a 55-slip Unifloat dock system at Regatta Marina. In addition, Vanderbilt established a mitigation area of mangrove and aquatic vegetation planted shoreward of the marina to improve water quality and the overall ecosystem of the bay.

Before June of 2002, Vanderbilt lagoon in Naples, Florida, was virtually void of vegetation, fish and other marine life. Since completion of the marina, Bellingham has commissioned a professional, independent study of the biological impact of the floating concrete dock system on the marine environment. Besides the slips, Bellingham installed the electrical system with locker boxes, potable water and fire suppression systems, aluminum gangways and spun concrete guide piling.

Bellingham Marine designs, manufactures and installs Unifloat® floating dock systems, Unideck® fresh water systems and Unistack® dry storage buildings.

Contact Bellingham Marine, PO Box 8, Bellingham, WA 98227. www.bellingham-marine.com.

Posted in: Press Releases Author: leilanifera

Share

FacebookTwitterGoogle +Pinterest

Leave a Reply / Cancel Reply

Explore Blog

Subscribe to our Mailing List

  • This field is for validation purposes and should be left unchanged.

Recent Posts

  • Construction Complete at Orange Beach Marina
  • Cosmetic Upgrade to Coasterra’s Event Float
  • Upgrades at Katherine Landing
  • Renovations Underway at San Francisco Bay Marina
  • Lake Mohave Marina Renovation Completed
  • Back to Blog
  • Prev
  • Next

© 2018 - 2022. Bellingham Marine Industries. All Rights Reserved. Privacy Policy. XML Sitemap.