Bellingham Marine Bellingham Marine
  • Home
  • Products
    • Floating Docks
      • Concrete
        • Unifloat
        • Unibolt
      • Wood Docks
        • Unideck Timber
        • Portable Wood
      • Aluminum
    • Wave Attenuators
    • Floating Platforms
      • Landing Platforms
      • Portable Platforms
      • Floating Structures
    • Drystack
    • Shoreline Protection
      • Dolosse
    • Precast Products
  • Services
    • Residential
    • Design/Build
    • Pre-Construction
    • General Contracting
    • After-Market Care
    • Product Supply
  • About
    • Overview
    • History
    • Our Clients
  • Projects
  • Press
    • Press Releases
    • Articles
  • Blog
  • Careers
    • Life at Bellingham Marine
    • Apply for a Job
  • Contact
  • Log In
  • Employee Benefits
Close
  • Home
  • Products
    • Floating Docks
      • Concrete
        • Unifloat
        • Unibolt
      • Wood Docks
        • Unideck Timber
        • Portable Wood
      • Aluminum
    • Wave Attenuators
    • Floating Platforms
      • Landing Platforms
      • Portable Platforms
      • Floating Structures
    • Drystack
    • Shoreline Protection
      • Dolosse
    • Precast Products
  • Services
    • Residential
    • Design/Build
    • Pre-Construction
    • General Contracting
    • After-Market Care
    • Product Supply
  • About
    • Overview
    • History
    • Our Clients
  • Projects
  • Press
    • Press Releases
    • Articles
  • Blog
  • Careers
    • Life at Bellingham Marine
    • Apply for a Job
  • Contact
  • Log In
  • Employee Benefits

Press Releases

NEW DRY STORAGE FACILITY OPENS ON ISLES OF CAPRI IN NAPLES, FLORIDA

July 27, 2009

Construction has been completed on the architecturally distinctive Tarpon Club Marina Dry Storage Facility, located on Isles of Capri in Naples, Florida.

Designed to accommodate up to 145 boats, the largest being 36 feet in length, The Tarpon Club Marina Dry Storage is the newest drystack facility in the Naples area.

A flexible design, utilizing Bellingham Marine’s Unistack, allows the holding racks to be adjusted to meet demand. There is also space to store an additional 30 boats outside the building bringing the total capacity to approximately 175.

“The building at The Tarpon Club Marina clearly demonstrates that drystacks can be more than a simple warehouse,” remarked Bellingham Marine’s Manager of Project Development, Steve Ryder. From large windows and textured walls to a clock tower, this 25,000-square-foot dry storage building fits in well with its upscale surroundings and is a great example of the advancements in architectural style of modern dry storage facilities.

Not only is the building beautifully constructed, but it has also been designed to withstand hurricane force winds. Both the building and its doors were designed to meet Florida’s strict Building Code requirements.

The Tarpon Club Marina reports great leasing activity for the facility. About 60% of the Marina’s racks have been leased since its opening in February of this year. “The feedback we’ve received from boaters has been overwhelmingly positive, especially in today’s economic climate,” said Mike Morrison, Dock Operations Supervisor at The Tarpon Club Marina, when asked about the Marina’s new dry storage building.

Centrally located, The Tarpon Club Marina is in close proximity to casual and fine dining restaurants. The Marina features wet and dry slips – both open to the public with fueling facilities, bait, wash racks, cleaning station, keypad entry system, complimentary ice, and quality service.

As the world’s leading design/build marina construction company, Bellingham Marine produces Unifloat saltwater systems, Unideck freshwater systems and Unistack dry storage systems for marinas worldwide. Bellingham Marine, P.O. Box 8, Bellingham, WA 98227; ph. 360-676-2800, fax. 360-734-2417, email. bmi@bellingham-marine.com

Unifloat, Unideck and Unistack are registered trademarks of Bellingham Marine.

Posted in: Press Releases Author: leilanifera
Download Word Doc Download PDF

Share

FacebookTwitterGoogle +Pinterest

Leave a Reply / Cancel Reply

Explore Blog

Subscribe to our Mailing List

  • This field is for validation purposes and should be left unchanged.

Recent Posts

  • Upgrades at Safe Harbor Loch Lomond Marina
  • How Bellingham Marine Maximised Innovation when it Built the Extension at Waikawa Marina
  • Superyachts Welcome at Palm Beach Marina
  • Construction Commences at The Marina at Dana Point
  • Port of LA Wilmington Waterfront Promenade
  • Back to Blog
  • Prev
  • Next

© 2018 - 2022. Bellingham Marine Industries. All Rights Reserved. Privacy Policy. XML Sitemap.