Bellingham Marine Bellingham Marine
  • Home
  • Products
    • Floating Docks
      • Concrete
        • Unifloat
        • Unibolt
      • Wood Docks
        • Unideck Timber
        • Portable Wood
      • Aluminum
    • Wave Attenuators
    • Floating Platforms
      • Landing Platforms
      • Portable Platforms
      • Floating Structures
    • Drystack
    • Shoreline Protection
      • Dolosse
    • Precast Products
  • Services
    • Residential
    • Design/Build
    • Pre-Construction
    • General Contracting
    • After-Market Care
    • Product Supply
  • About
    • Overview
    • History
    • Our Clients
  • Projects
  • Press
    • Press Releases
    • Articles
  • Blog
  • Careers
    • Life at Bellingham Marine
    • Apply for a Job
  • Contact
  • Log In
  • Employee Benefits
Close
  • Home
  • Products
    • Floating Docks
      • Concrete
        • Unifloat
        • Unibolt
      • Wood Docks
        • Unideck Timber
        • Portable Wood
      • Aluminum
    • Wave Attenuators
    • Floating Platforms
      • Landing Platforms
      • Portable Platforms
      • Floating Structures
    • Drystack
    • Shoreline Protection
      • Dolosse
    • Precast Products
  • Services
    • Residential
    • Design/Build
    • Pre-Construction
    • General Contracting
    • After-Market Care
    • Product Supply
  • About
    • Overview
    • History
    • Our Clients
  • Projects
  • Press
    • Press Releases
    • Articles
  • Blog
  • Careers
    • Life at Bellingham Marine
    • Apply for a Job
  • Contact
  • Log In
  • Employee Benefits

Press Releases

NEW YORK DOCKING FACILITY RECIEVES BMI UPGRADE

May 21, 2009

Bellingham Marine (BMI) has completed replacement of the East Creek Marina, located in Riverhead, New York. BMI acted as a supplier on the job.

The docking facility, available to residents of Riverhead by annual contract, was in need of replacement, as the wood docks built in 1989 were failing.

The improvements have been well-received by the townspeople. “The residents of the surrounding area love it,” says BMI Northeast Sales Manager Jay Varga. Riverhead Town Councilwoman Barbara Blass held a ribbon cutting ceremony on April 18th to celebrate the official opening of East Creek.

The marina offers 120 berths featuring concrete floating docks. Slips range from 20’ to 30’. Also available is a pump out station, storage (outdoor, wet, and dry), some repair services, fuel, bait and tackle, and a marine store. In addition to the amenities the marina offers to boaters, the facility also serves as a local attraction for land-lovers, offering indoor/outdoor showers, a picnic area, snacks, tennis, restrooms, and ample parking.

“Not only will boaters enjoy a first-class facility but residents and visitors will be able to utilize the Marina’s numerous other amenities,” remarked Varga.

As the world’s leading marina design/build construction company, Bellingham Marine produces Unifloat saltwater systems, Unideck freshwater systems and Unistack dry storage systems for marinas worldwide.

Bellingham Marine, P.O. Box 8, Bellingham, WA 98227; ph. 360-676-2800, fax. 360-734-2417, email. bmi@bellingham-marine.com

Unifloat, Unideck and Unistack are registered trademarks of Bellingham Marine.

Posted in: Press Releases Author: leilanifera
Download Word Doc Download PDF

Share

FacebookTwitterGoogle +Pinterest

Leave a Reply / Cancel Reply

Explore Blog

Subscribe to our Mailing List

  • This field is for validation purposes and should be left unchanged.

Recent Posts

  • Construction Complete at Orange Beach Marina
  • Cosmetic Upgrade to Coasterra’s Event Float
  • Upgrades at Katherine Landing
  • Renovations Underway at San Francisco Bay Marina
  • Lake Mohave Marina Renovation Completed
  • Back to Blog
  • Prev
  • Next

© 2018 - 2022. Bellingham Marine Industries. All Rights Reserved. Privacy Policy. XML Sitemap.