Bellingham Marine Bellingham Marine
  • Home
  • Products
    • Floating Docks
      • Concrete
        • Unifloat
        • Unibolt
      • Wood Docks
        • Unideck Timber
        • Portable Wood
      • Aluminum
    • Wave Attenuators
    • Floating Platforms
      • Landing Platforms
      • Portable Platforms
      • Floating Structures
    • Drystack
    • Shoreline Protection
      • Dolosse
    • Precast Products
  • Services
    • Residential
    • Design/Build
    • Pre-Construction
    • General Contracting
    • After-Market Care
    • Product Supply
  • About
    • Overview
    • History
    • Our Clients
  • Projects
  • Press
    • Press Releases
    • Articles
  • Blog
  • Careers
    • Life at Bellingham Marine
    • Apply for a Job
  • Contact
  • Log In
  • Employee Benefits
Close
  • Home
  • Products
    • Floating Docks
      • Concrete
        • Unifloat
        • Unibolt
      • Wood Docks
        • Unideck Timber
        • Portable Wood
      • Aluminum
    • Wave Attenuators
    • Floating Platforms
      • Landing Platforms
      • Portable Platforms
      • Floating Structures
    • Drystack
    • Shoreline Protection
      • Dolosse
    • Precast Products
  • Services
    • Residential
    • Design/Build
    • Pre-Construction
    • General Contracting
    • After-Market Care
    • Product Supply
  • About
    • Overview
    • History
    • Our Clients
  • Projects
  • Press
    • Press Releases
    • Articles
  • Blog
  • Careers
    • Life at Bellingham Marine
    • Apply for a Job
  • Contact
  • Log In
  • Employee Benefits

Articles

SMOOTHING THE WATERS: CHOOSING THE RIGHT WAVE MANAGEMENT SYSTEM

May 27, 2011

Thanks to modern marine engineering, boats no longer have to be tormented by choppy waves in the marina basin. Tenants demand millpond-still water inside marinas, and with current technology, marinas can give it to them. However, getting it right is not as simple as it seems. Many developers buy systems that are too much, or too little or just plain wrong for their marina, and getting it wrong can be expensive or disastrous.

MAGAZINE: Marina Dock Age
ISSUE: May/June 2011

FOR A COMPLETE COPY OF THE ARTICLE DOWNLOAD THE PDF.

Posted in: Articles Author: leilanifera
Download PDF

Share

FacebookTwitterGoogle +Pinterest

Leave a Reply / Cancel Reply

Explore Blog

Subscribe to our Mailing List

  • This field is for validation purposes and should be left unchanged.

Recent Posts

  • Upgrades at Safe Harbor Loch Lomond Marina
  • How Bellingham Marine Maximised Innovation when it Built the Extension at Waikawa Marina
  • Superyachts Welcome at Palm Beach Marina
  • Construction Commences at The Marina at Dana Point
  • Port of LA Wilmington Waterfront Promenade
  • Back to Blog
  • Prev
  • Next

© 2018 - 2022. Bellingham Marine Industries. All Rights Reserved. Privacy Policy. XML Sitemap.