Bellingham Marine Bellingham Marine
  • Home
  • Products
    • Floating Docks
      • Concrete
        • Unifloat
        • Unibolt
      • Wood Docks
        • Unideck Timber
        • Portable Wood
      • Aluminum
    • Wave Attenuators
    • Floating Platforms
      • Landing Platforms
      • Portable Platforms
      • Floating Structures
    • Drystack
    • Shoreline Protection
      • Dolosse
    • Precast Products
  • Services
    • Residential
    • Design/Build
    • Pre-Construction
    • General Contracting
    • After-Market Care
    • Product Supply
  • About
    • Overview
    • History
    • Our Clients
  • Projects
  • Press
    • Press Releases
    • Articles
  • Blog
  • Careers
    • Life at Bellingham Marine
    • Apply for a Job
  • Contact
  • Log In
  • Employee Benefits
Close
  • Home
  • Products
    • Floating Docks
      • Concrete
        • Unifloat
        • Unibolt
      • Wood Docks
        • Unideck Timber
        • Portable Wood
      • Aluminum
    • Wave Attenuators
    • Floating Platforms
      • Landing Platforms
      • Portable Platforms
      • Floating Structures
    • Drystack
    • Shoreline Protection
      • Dolosse
    • Precast Products
  • Services
    • Residential
    • Design/Build
    • Pre-Construction
    • General Contracting
    • After-Market Care
    • Product Supply
  • About
    • Overview
    • History
    • Our Clients
  • Projects
  • Press
    • Press Releases
    • Articles
  • Blog
  • Careers
    • Life at Bellingham Marine
    • Apply for a Job
  • Contact
  • Log In
  • Employee Benefits

Press Releases

THREE BELLINGHAM PLANTS RECEIVE ISO CERTIFICATION

January 18, 2010

It is with great pride that we announce that three additional Bellingham Marine plants have achieved ISO 9001:2008 certification. The three newly certified plants include Bellingham’s NE plant in York, Pennsylvania; Bellingham’s SE plant in Jacksonville, FL; and Bellingham’s Drystack operations in Callahan, FL.

“It’s been a tremendous team effort and the ISO representative indicated that he was impressed by the enthusiasm for and acceptance of the program by all the employees at each division,” said Phil Greenman, Executive Vice President of Bellingham Marine. “We now have six ISO certified plants and one PCI certified plant. This is a great accomplishment and is yet another example of our commitment to ensuring a quality product to our customers every time.”

The ISO certification is not only a way for developers and marina owners to identify sources of added value but provides third party verification. Like ISO, the PCI accreditation process requires an in-depth quality assurance plan and thorough inspections of the plant and its operations.

“We’ll continue to strive for improvement by getting all plants certified,” said Greenman. “Certifying more than a single plant reassures our customers that no matter where in the world their project is the same quality and level of service will be delivered.” All BMI’s U.S plants are quality accredited as well as its plants in Australia and New Zealand.

The ISO 9001:2008 is an international standard for quality management, quality assurance, and continuous improvement. This standard refers to how an organization’s processes are designed and managed to transform inputs or services designed to meet the customer’s objectives.

Bellingham Marine’s NE division serves the eastern regions of the United States and the SE division covers the southeast region including the Gulf States, as wells as the Caribbean and South America. All the company’s drystack work done worldwide with the exception of Australasia, which is covered by Bellingham Marine Australia, is handled out of BMI’s Callahan plant.

As the world’s leading marina design/build construction company, Bellingham Marine produces Unifloat saltwater systems, Unideck freshwater systems and Unistack dry storage systems for marinas worldwide.

Bellingham Marine, P.O. Box 8, Bellingham, WA 98227; ph. 360-676-2800, fax. 360-734-2417, email. bmi@bellingham-marine.com

Unifloat, Unideck and Unistack are registered trademarks of Bellingham Marine.

Posted in: Press Releases Author: leilanifera
Download Word Doc

Share

FacebookTwitterGoogle +Pinterest

Leave a Reply / Cancel Reply

Explore Blog

Subscribe to our Mailing List

  • This field is for validation purposes and should be left unchanged.

Recent Posts

  • Upgrades at Safe Harbor Loch Lomond Marina
  • How Bellingham Marine Maximised Innovation when it Built the Extension at Waikawa Marina
  • Superyachts Welcome at Palm Beach Marina
  • Construction Commences at The Marina at Dana Point
  • Port of LA Wilmington Waterfront Promenade
  • Back to Blog
  • Prev
  • Next

© 2018 - 2022. Bellingham Marine Industries. All Rights Reserved. Privacy Policy. XML Sitemap.